Dunn Dental Clinic – Lackland AFB for Electrical Repairs

Location: Lackland Air Force Base, TX
Owner: U.S. Air Force
Contract Value: $240,456.00
Completion Date: 07/2012
Customer: Kroeschell Engineering Company, Inc.
Category: Electrical

HJD Capital Electric, Inc. served as a subcontractor to Kroeschell, Inc., performing the electric portion of the design-build work to replace the generator and install two new automatic transfer switches at Dunn Dental Clinic. Capital replaced all interior panel boards, feeders, and transformers.

Over the course of the four-month project, Capital accommodated multiple change orders and worked after hours and on weekends to minimize downtime and ensure continued operations at the clinic.

Capital used a 3 phase QC inspection plan for each element of work to include monitoring work to ensure that materials and workmanship conform to specifications, ensuring that record drawings are promptly and accurately updated, resolving deficiencies before the quality of the end-product is affected, and conducting a pre-final inspection and verifying completion of punch-list corrections before scheduling final inspection.

The work was conducted in an ongoing medical clinic environment; therefore site specific plans included an Infection Control Plan with the standard Site Safety Plan. Negative Air Pressure and HEPA Filters were utilized throughout the project duration. Mats and safety nets were used while locating the panels and transformers in the interstitial to prevent items from falling through the next floor. Precautions were taken for dust control as well.