• 5424 U.S. 90 Access Road | San Antonio, TX 78227
  • Monday - Friday 7:30 AM - 4:30 PM
  • 210 | 681-0954

General Construction

Project Title: Design-Build Repair Student Dormitory B10255

Location: JBSA Lackland AFB, San Antonio

Client: US Air Force

Project Value: $8,253,803

CAPITAL managed all aspects of the design-build process to repair, renovate, and upgrade of all major systems and finishes to this 132 student dormitory. Built in 1987, B10255 is a 3-story, 39,945 ft2 modular brick veneer building with concrete masonry unit walls upon a poured-in-place concrete slab. Renovation activities include mechanical, electrical, plumbing, architectural, civil, structural, roof, utilities, hazardous material abatement, and mold remediation services. CAPITAL self-performed all electrical, plumbing, site utilities, concrete, and finish out as well as project management, QC, and safety.


Project Title: Medina River Trails Greenway, Phases 3 and 4

Location: San Antonio, TX

Client: City of San Antonio

Project Value: $8,587,784

This project consisted of the construction of over 6.5 miles of paved concrete trails within the 511-acre Medina River Nature Area. The project also involved the construction of two 26 car asphalt-paved parking lots, two prefabricated structural steel bridges, a cast-in-place concrete bridge, culverts/drainage structures, retaining walls, switchback sidewalks between two large elevations, power electrical distribution, potable water utilities, ADA compliant ramps, walkway and pole lighting, CCTV cameras, emergency callbox system, and street and trail signage. The bridges span the Medina River and Leon Creek.


Project Title: Design-Build Main Switching Station Expansion

Location: JBSA Lackland AFB, San Antonio

Client: 502D Contracting Squadron

Project Value: $2,889,040

CAPITAL maintained the lead on this emergency design/build project entailing the expansion of the existing Main Switching Station located at JBSA Lackland AFB, TX. Due to the increase in Base power requirements/usage, new electrical gear was installed and housed within the addition to the switch station/substation. The main switch station/substation feeds specific areas of the Base including dormitories, offices, training facilities, as well as the critically important hospital, Wilford Hall.

The project required structural construction to extend the existing Main Switch facility to house the new electrical gear. Earthwork entailed the demolition of the existing concrete sidewalks and man holes and the removal of cables from existing ductbanks. Electrical work included the installation of 45 ft main service riser pole with a 1,000 amp horizontal air break-switches, interior light fixtures, and four 1,200 amp sub-feeder breakers. For the existing switchgear cubicles, CAPITAL connected all input cables from the existing digital meters to each new multi meter of the new feeders. Exterior electrical work included installing a 3-way 6 inch duct bank from the existing vault to the new service riser poles, lighting control systems, and control cable for Energy Management and Control System (EMCS) equipment. Mechanical requirements included the installation of a new 5 ton packaged HVAC system and relocation of an existing HVAC system as well as the extension of a fire protection system throughout the new addition.